Showing posts with label Important points of Civil Engineer. Show all posts
Showing posts with label Important points of Civil Engineer. Show all posts

Saturday, August 22, 2020

Important points of Civil Engineer

1.)  POINT OF CONTRAFLEXURE: 
The point of Contraflexure is a point whese Bending Moment changes its sign (BM is zero). 
 2.) GRADE OF CONCRETE & MIX PROPORTION: 
               C:S:A 
1.) M-75 1:4:8 
2.) M-10 1:3:6 
3.) M-15 1:2:4 
4.) M-20 1:1-5 :3 
5.) M-25 1:1:2 3. 
Notes:- C:S:A° C-- Cement, S---Sand, 
A--- Aggregate
3) MINIMUM CLEAR COVER: 
As per IS Code 456:2000
a} Footing = 40mm
b} Column = 50 mm 
c} Slab & stairs = 15 mm 
d} Beam  = 25 mm 
4.) DENSITY 
i} R.C.C = 2500 kg/m³
ii} Steel - 7850 kg/m³ 
iii} Brick = 1600 - 1920 kg/m³ 
iv} PCC= 2400 kg/m³ 
v} Cement = 1440 kg/m³

Types of drawings in any construction project:

Types of drawings in any construction project: 1. IFC Drawing: Detailed drawings considered final, issued, and approved by the design team f...