1.)  POINT OF CONTRAFLEXURE: 
The point of Contraflexure is a point whese Bending Moment changes its sign (BM is zero). 
 2.) GRADE OF CONCRETE & MIX PROPORTION: 
               C:S:A 
1.) M-75 1:4:8 
2.) M-10 1:3:6 
3.) M-15 1:2:4 
4.) M-20 1:1-5 :3 
5.) M-25 1:1:2 3. 
Notes:- C:S:A° C-- Cement, S---Sand, 
A--- Aggregate
3) MINIMUM CLEAR COVER: 
As per IS Code 456:2000
a} Footing = 40mm
b} Column = 50 mm 
c} Slab & stairs = 15 mm 
d} Beam  = 25 mm 
4.) DENSITY 
i} R.C.C = 2500 kg/m³
ii} Steel - 7850 kg/m³ 
iii} Brick = 1600 - 1920 kg/m³ 
iv} PCC= 2400 kg/m³ 
v} Cement = 1440 kg/m³

What is Bally Benching Process?

The Bally Benching Process is a slope stabilization technique used for slope protection, especially in hilly terrains and construction sites...